OK, its officially a bathroom. Here are the final pictures. The shower is white 3 x 6 subway tiles with black trim tiles. The shower floor is 1 inch black and white hex tiles. The wall sconces have LED lights. The floor is vinyl. The tub was custom painted. We lost the bathroom closet but did get some built in shelves. We also got a new window, space heater and exhaust vent. We got some new towels and rugs for Christmas, but the space is big enough that I will need to get a longer runner-type rug for in front of the tub. I also need to pick up tp and towel racks. I would also like to get some hooks for the back of the door, a new door knob, and a shelf to hold a few things.
We are getting close to a finished bathroom. They put in the flooring and the tub and started putting in the baseboards today. The electrician also finished all the electrical stuff today, we have a new exhaust vent with a digital control and a new built in space heater.
They need to put in the new window, finish the trim work, install the sink and toilet and the shower glass and then we are done.
Even with walling up the closet and having a separate tub and shower it appears we still have plenty of room.